24hr breakdown serviceFREE first consultationLicensed waste carriersinfo@ADPenviro.co.uk
Call us today0800 0235479Get In Touch

Septic Tank AdviceDesign, sizing and installation

Septic Tank Sizes and Shapes

Published
Updated
Reading time
3 min

Request a quotation

If you’d like a quotation, we’d love to hear from you. Please leave us your details below and we’ll come back to your at the earliest opportunity. Thank you!

    In this guide

    The short answer

    A septic tank for a home in England must hold at least 2,700 litres, which covers up to four people, plus 180 litres for each extra person. That is the building regulations minimum. Systems installed since February 2006 should also be sized to British Water's Flows and Loads guidance, which bases the size on the property rather than who lives there today.

    Drainage field trenches cut
    From an ADP jobDrainage field trenches cut

    Shape matters far less than size. Most of what you see on the market is about how the tank gets into the ground.

    The minimum size in building regulations

    Approved Document H sets the floor. A worked example makes it clearer.

    UsersMinimum capacity
    Up to 42,700 litres
    52,880 litres
    63,060 litres
    83,420 litres
    103,780 litres

    In practice most installers go above the minimum. A bigger tank settles solids better and copes with surges, such as several showers in a row on a busy morning.

    Size for the house, not the household

    A family of three in a five-bedroom house has a tank sized for a five-bedroom house. The next owners may fill every room. British Water's Flows and Loads guidance, which the general binding rules point to for anything installed after 1 February 2006, works from the property for this reason.

    The same logic applies when a house grows. An extension, a loft conversion or an annexe connected to the same tank can push it past its capacity. The rules require the system to handle the maximum it will ever need to treat, so the sums need redoing after any change like that.

    Holiday lets and businesses

    Holiday lets are often fully occupied, with more people than a family home of the same size. Flows and Loads gives separate figures for them and for commercial premises such as pubs, cafés and campsites. Daily volume is a factor here too, because the general binding rules cap discharges to ground at 2 cubic metres a day. Above that you need a permit, and since April 2026 a standard rules permit may cover it, as we explain in septic tank permit or general binding rules.

    Common shapes

    Spherical or onion-shaped. Typical of GRP tanks. The shape is strong under ground pressure, and the narrow neck brings the access cover up to the surface.

    Cylindrical, lying horizontally. A long tank with chambers along its length. It suits shallow excavations and sites with a high water table, because it doesn't need to go as deep.

    Rectangular. Usual for concrete and brick tanks built on site, and some precast units. Older properties often have this shape.

    Whatever the shape, the tank should have at least two chambers, or two tanks in series, so solids that escape the first are caught in the second.

    Depth and access

    Size also affects how deep the tank sits, and depth affects emptying. Building regulations ask for the tank to be within 30 metres of where a tanker can park, with the bottom of the inlet no more than 3 metres below that level. Our page on how deep a septic tank is covers this.

    Is my tank too small?

    Signs include solids reaching the drainage field soon after emptying, slow drains when the house is full, and a tank that seems to fill much faster than it should. Many old tanks were sized for a different era of water use, with no showers or washing machines, and are smaller than today's minimum.

    If you are not sure your tank is big enough, our septic tank inspections include measuring its capacity against the household it serves. For a new or larger tank, see septic tank installation, and for how the drainage field is sized alongside it, read how big should a drainage field be.

    Checked against Approved Document H and the GOV.UK general binding rules on 15 October 2026.

    Paul Pilling

    About the Author:

    Paul Pilling

    Director & Septic Tank Specialist

    Paul has over 20 years experience working in the waste water industry and as such he is well suited to provide expert advice and solutions to all your sewage needs.

    He began his career as a maintenance engineer working primarily on pumping stations. He then joined one of the largest manufacturers of sewage treatment plants as a maintenance engineer, progressing to Lead Engineer, before joining ADP Environmental Services.

    Every guide by Paul Pilling

    Sources this guide links to

    1. Approved Document Hgov.uk

    Looking For a Trustworthy Service Near you? Get in Touch With ADP Environmental Services

    Call now Get In Touch