    The short answer

    The treated water from a sewage treatment plant goes one of two ways. It either soaks into the ground through a drainage field, or it flows into a river or stream that runs all year. In England each route has its own daily limit under the general binding rules: 2 cubic metres a day to ground, 5 to surface water.

    Treatment plant lifted into position, Yorkshire
    From an ADP jobTreatment plant lifted into position, Yorkshire

    Which route your plant uses depends on the site. Many rural homes don't have a suitable watercourse, so ground is the more common answer.

    What leaves the plant

    By the time water leaves a working treatment plant it has been through settlement, biological treatment with air pumped in, and a final settling stage. What comes out should be fairly clear with little smell. It is not drinking water, and it still carries some nutrients and bacteria, which is why the rules control where it can go. Our guide to sewage treatment plant effluent covers what good and bad effluent look like.

    Route one, into the ground

    The effluent runs through perforated pipes laid in gravel-filled trenches, called a drainage field, and soaks away into the soil. Bacteria in the soil finish the treatment before the water reaches groundwater.

    The main conditions in England are these:

    • No more than 2 cubic metres (2,000 litres) a day.
    • The drainage field must be built to BS 6297:2007. A mound is acceptable outside a floodplain, and since 23 July 2026 so is ground engineered to slow percolation, if it reaches a percolation value of at least 15.
    • No discharge through a well or borehole, and no use of a rainwater soakaway installed after December 2007.
    • A permit is needed if the discharge point is in groundwater source protection zone 1.

    Treatment plant effluent is cleaner than septic tank effluent, so the drainage field can usually be smaller. BS 6297 uses a lower sizing factor for treatment plant effluent than Approved Document H applies to septic tanks. Our guide on whether a treatment plant can discharge to a soakaway goes into the ground route in more depth.

    Route two, into a river or stream

    A treatment plant is the only kind of system allowed to discharge to surface water under the general binding rules. Septic tanks can't.

    • No more than 5 cubic metres (5,000 litres) a day.
    • For discharges started since 2015, the watercourse must flow all year round, except in a drought. A ditch that dries out each summer does not qualify, and neither does an enclosed lake or pond.
    • There are buffer zones around sensitive waters. They run to 500 metres for sites such as SSSIs and bathing waters, 200 metres for aquatic local nature reserves and 50 metres for chalk rivers.
    • A partial drainage field next to the watercourse is allowed for treatment plants, as long as the perforated pipe goes no more than 10 metres from the edge of the water.

    You also need the right to discharge to the watercourse and to run a pipe to it, which can mean an agreement with whoever owns the land between.

    How do you choose?

    The ground decides first. A percolation test shows whether the soil will take the water. Clay, a high water table or rock close to the surface can rule out a drainage field, which is when a watercourse becomes the better option. Where neither works well, the 2026 standard rules permits sometimes open a route that the general binding rules don't.

    Distances come into it as well. Approved Document H says the discharge from a treatment plant should be sited at least 10 metres from watercourses and any other buildings, and a drainage field 15 metres from any building.

    What about rainwater?

    Keep it out. Gutters and surface water drains should never run into a treatment plant. Rainwater dilutes the process, washes bacteria through and can overload the drainage field in wet weather.

    Where a permit is needed

    If the daily volume is over the limit, the discharge point is in source protection zone 1, or the site breaks another rule, you need a permit. Since April 2026 some of these cases can use a standard rules permit. SR2025 No 5, for instance, covers secondary treated effluent between 2 and 5 cubic metres a day to ground. See septic tank permit or general binding rules for the options.

    We design treatment plant installations around the discharge route from the first site visit. See our sewage treatment plant installation service. If you have a plant already and are unsure where it discharges, a treatment plant inspection will trace it.

    Checked against the GOV.UK general binding rules for ground and surface water on 15 October 2026.

    Paul Pilling

    About the Author:

    Paul Pilling

    Director & Septic Tank Specialist

    Paul has over 20 years experience working in the waste water industry and as such he is well suited to provide expert advice and solutions to all your sewage needs.

    He began his career as a maintenance engineer working primarily on pumping stations. He then joined one of the largest manufacturers of sewage treatment plants as a maintenance engineer, progressing to Lead Engineer, before joining ADP Environmental Services.

    Every guide by Paul Pilling

    Sources this guide links to

    1. groundgov.uk
    2. surface watergov.uk

    Looking For a Trustworthy Service Near you? Get in Touch With ADP Environmental Services

    Call now Get In Touch